The order for nine grid connections will strengthen a power transmission network spanning more than 1,000 kilometers of overhead lines across nine rural districts of Madhya Pradesh. The state has increased its momentum to reach a target of 12 GW of renewable energy generation capacity by 2025 - through utility-scale solar, wind and hybrid installations as well as rooftop solar.